{"product_id":"ancol-outside-training-line-for-dogs-puppies-black-nylon-long-lead-for-recall-commands-durable-open-space-walking-accessory-9-m","title":"Ancol Outside Training Line for Dogs Puppies - Black Nylon Long Lead for Recall Commands - Durable Open Space Walking Accessory - 9 m","description":"\u003cul class=\"a-unordered-list a-vertical a-spacing-mini\"\u003e\n\u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003eRecall Training: Designed specifically to support teaching recall commands, giving your dog freedom to roam while allowing safe, controlled corrections during outdoor training.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003eOutdoor Ready: Ideal for use in open spaces such as parks or fields, this training line helps reinforce behaviour without sacrificing your dog’s sense of freedom.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003eDurable Material: Made from tough nylon for strength and weather resistance, providing lasting performance even during repeated outdoor sessions or in damp conditions.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003eReliable Grip: Extra strong construction ensures consistent control over large or excitable dogs, making it a trusted choice for trainers and owners alike.\u003c\/span\u003e\u003c\/li\u003e\n\u003cli class=\"a-spacing-mini\"\u003e\u003cspan class=\"a-list-item\"\u003eExtended Reach: Measures 9 meters in length, giving you the ability to manage distance-based exercises effectively while maintaining a safe connection with your dog.\u003c\/span\u003e\u003c\/li\u003e\n\u003c\/ul\u003e","brand":"Superpetstoreuk247","offers":[{"title":"Default Title","offer_id":56913923441024,"sku":"LH-NLYZ-B6FV","price":17.99,"currency_code":"GBP","in_stock":false}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0602\/4822\/8009\/files\/81puvE1nfiL._AC_SX425.jpg?v=1763731013","url":"https:\/\/www.superpetstoreuk.co.uk\/products\/ancol-outside-training-line-for-dogs-puppies-black-nylon-long-lead-for-recall-commands-durable-open-space-walking-accessory-9-m","provider":"Superpetstore","version":"1.0","type":"link"}